This was presented at the latest DFO follow-up meeting in Moncton, NB on November 27th, 2008,  pertaining to a 10 year lobster management plan for each LFA in the Gulf Region.  DFO is advising each LFA to create a 10 year plan based on the following criteria: 

 

Responding to the FRCC Report
Meeting November 27, 2008

Short Term Biological Goal (2009 - 2011)

Set minimum carapace size for lobster based on allowing 50% of mature females to be protected from fishery.

  • minimum carapace size of 72mm in LFAs 23, 24, 25, 26A and 75mm in 26B by 2011
  • minimum carapace size increase of 1mm
  • appropriate size escape mechanism by 2011

Long Term Goal (2009 - 2018)

  • Reduce exploitation rate by10% by 2018
  • Increase productivity
  • Strengthen stewardship of the resource

Effort reduction and productivity are linked:

  • The higher the productivity levels less need to reduce effort and vice versa
  • However, must move forward somewhat on both effort reduction and productivity
  • Other than biological criteria, no other measures are needed until 2011
  • Credit given for measures implemented since 2005

Proportion of long-term goal achieved (%)
0
1-10
11-20
21-30
31-40
41-50
51-60
61-70
71-80
81-90
91-100
Rating
0
1
3
4
5
6
7
8
9
10
                       
Reduce Effort Minimum points needed = 3
Increase Productivity Maximum points allowed = 5
Strengthen Stewardship Maximum points allowed = 2
Total Needed 10


 

Proposed Evaluation Criteria Long Term Goal
Meeting November 27, 2008
GOAL Reduce exploitation rate by 10% by 2018 Increase productivity Strengthen stewardship of the resource

Proportion of long-term goal achieved (%)
0
1-10
11-20
21-30
31-40
41-50
51-60
61-70
71-80
81-90
91-100
Rating
0
1
2
3
4
5
6
7
8
9
10
                     
Reduce Effort Minimum points needed = 3
Increase Productivity Maximum points allowed = 5
Strengthen Stewardship Maximum points allowed = 2
Total Needed 10

Effort Reduction Measures
Options
23A
23B
23C
24
25
26A1/3
26A2
26B
Number of days fished
at the end of the
season reduced by
1
1
1
1
1
1
1
1
1
2
1
1
2
2
1
1
1
1
3
2
2
2
2
2
2
2
2
4
2
2
2
3
2
3
2
2
5
2
2
3
4
3
3
3
3
6
3
3
4
4
4
4
3
3
7
5
5
6
5
6
6
4
4
8
6
6
6
6
6
7
5
4
9
7
7
7
7
7
8
6
5
10
7
7
7
8
8
9
8
5
11
8
8
8
9
9
10
9
6
12
8
8
9
9
10
10
10
7
13
10
10
10
10
10
10
10
9
14
10
10
10
10
10
10
10
10
 
Rating
23A
23B
23C
24
25
26A1/3
26A2
26B
Number of traps per harvester reduced by
1
164
164
118
75
122
152
82
161
2
165
165
119
78
123
154
85
162
3
167
167
121
80
125
155
87
163
4
168
168
123
82
126
157
89
165
5
179
179
125
84
127
158
91
166
6
171
171
127
87
128
160
93
168
7
172
172
129
89
130
161
96
169
8
174
174
130
91
131
163
98
170
9
175
175
132
93
132
164
100
172
10
176
176
134
96
134
166
102
173

 

Latest News

October 21, 2016
Maritime Electric Cable Project

October 17, 2016
Tribute to Captain Tony Carter
Tribute to Tony Carter by Sara Roach Lewis .../more >

October 12, 2016
Logbook Reminder

October 7, 2016
71 years a fisherman

October 7, 2016
Fishermen’s Forum 2016
Sustaining the Fisheries: Challenges and Changes - November 21st- 22nd, 2016 - Antigonish, NS .../more >

October 6, 2016
Tuna Reallocation Update - October 6th

September 28, 2016
Tuna Reallocation Update

September 23, 2016
Anthony "Tony" Carter

September 21, 2016
Kings Country News - Lobstering ban and 25,000 in fines

September 19, 2016
PEI International Shellfish Festival - Guardian Article



Renew your
PEIFA MEMBERSHIP

 

Renew Now

© Rachel Peters Photography
 
Options
Rating
 
Productivity
Measures
Options
Rating
   
Maximum carapace size (mm)
males and females
125
1
  Minimum carapace
size LFAS 23, 24, 25, 26A (mm)
73-75
1
   
120
2
 
75-76
2
   
115
3
 

77-78

3
   
 
Options
Rating
 
79
4
   
Minimum number of traps per line
3-5
1
 
>79
5
   
6-9
2
 
Productivity
Measures
Options
Rating
   
10
3
  Minimum carapace
size LFA26B (mm)
76
1
   
 
Options
Rating
 
77
2